Guidance for Greenhouse Gas Inventory in the Construction Sector

Table Of Contents

Table Of Contents

greenhouse_gas_inventory_for_the_construction_sector_circular_13_2024_tt_bxd_800

On December 20, 2024, the Ministry of Construction officially issued Circular 13/2024/TT-BXD, detailing procedures and technical regulations for greenhouse gas (GHG) inventory, measurement, reporting, and verification (MRV) of GHG mitigation in the construction sector.

Circular 13/2024/TT-BXD serves as a crucial document to ensure that businesses in the construction sector conduct GHG inventories accurately, consistently, and in compliance with legal requirements.

CONTENTS:

1. Requirements for GHG Inventory, Measurement, Reporting, and Verification (MRV) of GHG mitigation

2. Process for conducting a GHG Inventory

3. Steps for GHG Measurement, Reporting, and Verification (MRV)

4. Trusted GHG Inventory service provider – Supporting Construction enterprises in compliance

1. Requirements for GHG Inventory, Measurement, Reporting, and Verification (MRV) of GHG reduction

The requirements for GHG inventory and MRV in the construction sector must adhere to the criteria stipulated in Decree 06/2022/ND-CP and Circular 01/2022/TT-BTNMT, specifically:

  • Comprehensive: Covering all GHG emission sources. Data must be collected continuously, without interruption, and accompanied by an explanation for any changes.

  • Consistent: Ensuring consistency in data, calculations, and methods. Any changes must be clearly reported and cross-verified.

  • Transparent: Data, assumptions, methods, and sources must be fully documented, explained, cited, and archived.

  • Accurate: Results must be reliable and minimize errors based on chosen methodologies.

The requirements for verifying GHG inventory results and GHG mitigation in the construction sector comply with Article 9 of Circular 01/2022/TT-BTNMT, issued by the Ministry of Natural Resources and Environment.
→ Learn more: Scope of GHG Emission Reporting | Key Compliance Notes for Enterprises

2. Process for conducting a GHG Inventory

According to the provisions of Article 5 of Circular 13/2024/TT-BXD, the process for GHG inventory in the construction sector is carried out in the following sequence:

the_ghg_inventory_process_800

The GHG inventory process

→ Learn more: ISO 14064-1 Standard for GHG Inventory and Emission Reporting

3. Steps for GHG Measurement, Reporting, and Verification (MRV)

The process for GHG mitigation MRV in the construction sector is stipulated in Article 6 of Circular 13/2024/TT-BXD, including the following steps:

▶ Step 1: The MRV process for GHG mitigation in the construction sector is conducted as follows:

▶ Step 2: Develop a GHG mitigation plan.

▶ Step 3: Measure the results of GHG mitigation measures.

▶ Step 4: Report on GHG mitigation results.

▶ Step Verify and submit GHG mitigation results.
→ Learn more: Technology Transfer for GHG Inventory | Efficient Support for Enterprises

4. Trusted GHG Inventory service provider – Supporting Construction enterprises in compliance

With over 67 years of expertise in energy and environmental consultancy, Vinacontrol is proud to be a leading provider of comprehensive, reputable, and professional GHG inventory services. We not only ensure full legal compliance but also partner with businesses to optimize processes, reduce costs, and achieve sustainable environmental commitments.

vinacontrol_provides_ghg_inventory_services_for_businesses

→ Explore Vinacontrol's GHG Inventory Services: right here

Contact our experts at Hotline: +84 243 943 3840 or chat via Zalo for the best consultation and support!